Ocean & Air Freight
How long does shipping from China to Europe take?
Europe has three practical routes from China, each with a different cost/speed trade-off.
Ocean (FCL/LCL) — Shanghai or Ningbo to Rotterdam, Hamburg, Antwerp or Felixstowe is typically 30–38 days port to port. Mediterranean ports such as Valencia, Genoa or Piraeus run 25–33 days and are often faster for southern Europe. Add 3–7 days for inland delivery and 1–3 days for EU import clearance.
Rail (China–Europe block trains) — about 18–22 days door to door to Poland, Germany or the Netherlands. Priced between ocean and air; useful for mid-value cargo when ocean is too slow.
Air freight — 4–7 days door to door via Frankfurt, Amsterdam, Paris, Liège or Luxembourg. Best for high-value or time-critical shipments.
Two European specifics to plan for: EU import VAT is due at the point of import (IOSS can simplify low-value B2C shipments up to EUR 150), and goods must meet EU product rules — CE marking, EPR registration in some countries and packaging rules. Build those compliance costs into your landed-cost model rather than discovering them at customs.
Last updated 2026-11-15